The project takes Shanxi Qiguang Power Generation Co., Ltd.'s 2×350MW generator units as the starting point of centralized heating, and constructs a first-level heating network to Miaowang Bridge in Lingshi County. DN1200 pipeline, with a length of about 2×28km; a new intermediate pump station is built.
Jincheng City Zhongyuan Street Reconstruction and Underground Comprehensive Corridor Road Project
This project is a heat migration into the corridor primary network, located in Zhongyuan Street, Jincheng City, as the main heat channel for Jincheng Thermal Power Plant to heat the urban area, laying 2 DN1200 heat pipelines to meet the heating needs of urban residents
Tangshan Port Caofeidian District Central Heating Long-Distance Pipeline Project (DN1200)
The project starts from the North Loop of the industrial zone in the south, passes through the equipment manufacturing park, Nanbao Salt Field, small and medium-sized enterprise park, Four Farms, and Five Farms, and ends at the North District Boiler Room on Chuangye Street in Caofeidian City.
Taiyuan City Central Heating Project Yangqu Heat Source Long-Distance Heating Network Project
To promote the comprehensive reform of the energy revolution and the transformation and upgrading of the centralized heating industry, Taiyuan City decided to build the Yangqu Heat Source Project.
Taiyuan City Central Heating Project Taigu Heating Network Project (DN1400-700)
The project is the Taiyuan City Central Heating Project for the high-altitude area of Taigu in 2021, the southern area, Dongfeng Gas Peaking Heat Source Factory, Xishan Mining Area expansion and transformation, networking expansion transformation
Taiyuan City Central Heating Project Taiyuan Economic Zone Central Heating Project
This project is the Taiyuan City Central Heating Project for the Taiyuan Economic Zone centralized heating project, and the centralized heating network project required for the construction of the Taiyuan Economic Zone road. Our company provides hard polyurethane spray polyethylene winding prefabricated direct burial insulation pipes DN1200 for a total of 4.8km.