Tangshan Port Caofeidian District Central Heating Long-Distance Pipeline Project (DN1200)
The project starts from the North Loop of the industrial zone in the south, passes through the equipment manufacturing park, Nanbao Salt Field, small and medium-sized enterprise park, Four Farms, and Five Farms, and ends at the North District Boiler Room on Chuangye Street in Caofeidian City. The total length of the line is 28 kilometers, and the pipeline laying method is mainly direct burial, with partial overhead.
The project uses Huaren Power Plant as the centralized heat source and Caofeidian City Boiler Room as the auxiliary heat source to solve the centralized heating problem in Caofeidian City. The power plant's heating capacity can meet the heating area demand of about 4 million square meters, and after the technical transformation in 2018, it can reach 8 million square meters of heating area in the long term, and can meet 32 million square meters of heating area in the long term. Our company undertakes part of the DN600-1200 full length of about 16.84 km of insulation pipes, fittings, and on-site interface work.