Shanxi Zhangshan Power Generation Co., LTD Central Heating Project
The project site is located in Changzhi City, Shanxi Province. Zhangshan Power Generation Company has an installed capacity of 2×300MW+2×600MW subcritical direct air cooling turbine generator units, extracting steam and 1×300MW unit waste heat heating, with a designed heating area of 14 million square meters. The first phase of the project installed two domestic 300 MW direct air cooling, desulfurization, coal-fired generator units, among which Unit No. 1 is the first 300 MW class direct air cooling generator unit in China to be put into commercial operation, and the world's first 300 MW class semi-dry desulfurization unit to be put into commercial operation.
The second phase of the project installed two domestic 600 MW coal-fired generator units, and the construction of the project simultaneously implemented direct air cooling, bag dust removal, high-pressure frequency conversion, denitrification, desulfurization, micro-oil ignition, and treated water deep treatment, and other environmental protection and energy-saving technologies, to maximize environmental protection and achieve a healthy and unified development of economic benefits, social benefits, and environmental benefits.
Previous Page